Latest News

Staad - Pro

STAAD stands for Structural Analysis And Design. STAAD Pro software is widely used in analyzing and designing structures-building, bridges, towers, transportation, industrial and utility structures. Designs can involve building structures including culverts, petrochemical plants, tunnels, bridges, piles; and building materials like steel, concrete, timber, aluminum and cold-formed steel.


Covered Topics:

  • Introduction to Structural engineering

  • Introduction to STAAD.pro V8i

  • Model Generation and Editing

  • Assigning loads

  • Automatic load generation: Slab, Wind and Moving loads

  • Creating Load Combinations

  • Concrete Design

  • Seismology

  • Seismic Analysis and Design

  • Dynamic Analysis

  • FEM/FEA

  • Steel Design

  • Foundation Designs

  • Report Generation and Plotting


MS Project

3ds Max, is a professional 3D computer graphics program for preparing 3D animations, models, games and images. The Autodesk 3D Max software gives an indetailed 3D modeling, rendering, and animation.3Ds Max along with Vray software has a lot of features that helps the modelers, the renders and the designers to create flawless photo-realistic 3D images as well as 3D animations of any construction element.


Covered Topics:

  • Introduction To 3ds Max

  • Standard Primitives

  • Extended Primitives

  • Splines

  • Modifier List

  • Material

  • Miscellaneous design:AEC extended

  • Compound objects

  • Spline editing

  • Editable poly

  • Rendering

  • Lights

  • Camera


Photoshop

Sketch up is an integrated 3D Modeling Software, widely preferred by construction owners, inspectors, architects, engineers and subcontractors for precision enriched work output.There is an online library of free model assemblies, 3D Warehouse. This includes drawing layout functionality, surface rendering. Extension Warehouse capabilities and enables placement of its models within Google Earth.


Covered Topics:

  • User interface

  • Drawing Objects

  • Modify Objects

  • Exploring Object Sources

  • Exploring Object Sources

  • Materials

  • Setting Units and Snapping

  • Dimension & Text Labels

  • Add Geo-Location

  • Use Array

  • Use Follow me tool

  • Use Solid Tools

  • Use Sandbox Tools

  • Organizing Objects

  • Use Scenes

  • Advance Camera tools

  • Animation Settings


Course Timing at Reliant Institute of Technology

  • Full time / Part time / Weekend

Timings:

  • Full time - Monday to Friday
  • Part time - Monday to Friday - Morning
  • Part time - Monday to Friday - Evening
  • Weekend
--

Reliant Institute of Technology is the Authorized tekla Training Center in Kerala Read More... View our Brochure Certificate Verification


Specifically designed online program for foreign nationals and overseas Job seekers. Read More...